top of page

Unit 14. Floors 1

Unit 14. Floors 1.

(email)

Re: platform framing project

Mr. Peterson,

I’d like to discuss the platform framing project. Your last email mentioned that you are waiting for joists and beams to be delivered. When they arrive, go ahead and build the support for the floor. As a reminder, the beams need to be exactly six meters long. The joists should be placed apart and parallel to each other to span the floor.

Before you get started, please ensure that the mudsills and joist connections are in place and attached firmly. As we discussed, the wood used in this project should be hem fir or spruce. These woods are a lot less expensive than oak. Also, ensure that the metal components of the trusses are approximately 20 cm in length. Once you’ve got the supports in place, go ahead and put in the subfloor. This will work as our diaphragm.

That’s all for now. - Jim Martin.


1. Before you read the passage, talk about these questions.

1 What part of a frame provides support?

2 What is the name for a triangular structural frame?



Reading

2. Read the email. Then, choose the correct answers.

1. What is the purpose of the email?

A. to discuss the details of a project

B. to describe the mistakes on a project

C. to order some hem-fir wood beams

D. to give instructions about a subfloor

2. What information is NOT provided?

A. the length of the beams

B. the type of wood to use

C. the time of beam delivery

D. the span of the joists

3. What will happen after the beams arrive?

A. the subfloor will be replaced

B. the joist connections will be attached

C. the trusses will be measured

D. the support will be built


Vocabulary

3. Match the words (1-7) with the definitions (A-G).

1_ subfloor

2_support

3_diaphragm

4_joist

5_mudsill

6_truss

7_joist connections

A. a small piece of wood that connects the joists

B. a piece of wood attached to a foundation that forms the base of a frame

C. long structural frame made up of triangular shapes

D. a structural plane designed to resist lateral force

E. a series of wood beams that holds up a floor

F. a layer of wood beneath the actual floor

G. a piece of wood that spans the distance between beams


4. Fill in the blanks with the correct words from the word bank.

span beam floor parallel

1. Use strong wood to __ ____that gap.

2. The walls are____________ to one another.

3. A___________supports all people and furniture in a building.

4. Don’t use a__________that has cracks or is bent.


5. Listen and read the email again. What are some types of wood that will be used in this floor?


Listening

6. Listen to a conversation between an employee and a supervisor. Choose the correct answers.



1. What problem do the speakers discuss?

A. the floor collapsed

B. the subfloor is too thin

C. the joist connections broke

D. the beams and joists are too small


2. What does the man suggest?

A. returning the old parts

B. building a new support

C. putting in a thicker subfloor

D. ordering new beams


7. Listen again and complete the conversation.


Supervisor: Well, the joists and beams were 1___________. They’re 2___________that project. We’re going to have to redo all of them.

Employee: Isn't there something else we can do? Like 3_________ ___________

__________thicker subfloor?

Supervisor: No, it’s too dangerous. The smaller beams can’t 4_______ _______ __________ .We have to replace them.

Employee: That will be really expensive Well have to order brand new 5 ______ __________ _____________.

Supervisor: I know, but it's a safety issue. The floor could collapse. So we 6_____ ______________ ______________it.


Speaking

8. With a partner, act out the roles below based on Task 7. Then, switch roles.


Use language such as:

There’s a problem with the…

The… are too….

The floor could collapse…

Student A: you are a supervisor Talk to Student B about:

· a floor project

· a problem with some construction parts

· a solution

Student B: you are an employee Talk to Student A about problem with a floor project.


Writing

9. Use the email and the conversation from Task 8 to fill out the inspection report.

Inspection Report

Location__________________________________________________________

Area inspected______________________________________________________

Problems___________________________________________________________

Steps to be taken ____________________________________________________


1 Use strong wood to ______________ that gap. 2 The walls are________ __ to one another 3 A_____________ supports all people and furniture in a building 4 Don l use a______________ that has cracks or is bent Listen and read the email again. What are some types of wood that will be used in this floor?

Приложение:

Недавние посты

Смотреть все

Glossary

Glossary above grade [adj-u15] if a part of building is above grade, it is above ground level. accident [n-count-u2] an accident is an...

Unit1. Careers

Unit1. Careers. (Job listings) JOS Contractors is taking applications for three skilled positions: carpenter, electrician, and HVAC...

Unit 2. Worksite safety

Unit 2. Worksite safety. Worksite safety. NOTICE (worksite safety poster) Follow the guidelines below at all times. In the event of an...

Comments


bottom of page